St. Christopher’sÂ
See pictures click here
Heat/AC pumps have been installed. These have made a huge inpact on heating and air conditioning. The worship space is enviornmentally welcoming no matter what time of year!
The Bank building has been remodeled into a Chapel.
The Chapel parking lot has been greatly expanded.
Remaining Projects:
The office was moved from the basement to the Church level. A heat pump needs to be installed in the new space.
The office space and hallway in the basement will be analyzed for enlarging the kitchen and creating a better entrance into the Hall.
Replace Narthex floor.
Replace several Hall windows.
Other Projects:
Install additional hand railings along side walk between hall entrance and front doors.
New Church & Hall flooring.
At Ascension Chapel located across the street at 2 Moulton Lane the bank drive through has been removed. Ledge has been removed which allowed for expanded parking. The finish top coat of pavement is being installed in July.
The Chapel sign needs to be approved and installed.